Lean for labs: how to spot the eight wastes in your lab

Learn about the eight wastes of lean, what they look like in a lab, and how to start removing them.

Scientist looking into a vial - blog post image for the 8 wastes of lean in a lab

In my last post, I described Invisible Drag: the chasing, re-keying and firefighting every lab has learned to live with. This post gives you a way to name it, count it and start removing it. The toolkit is more than 70 years old, and it started on a car factory floor.

You can’t fix what you can’t name

When I ask lab leaders about drag, most nod straight away. Then I ask them to list it, and the room goes quiet.

That’s not a failure of insight. Drag is hard to list because it hides inside normal work. The re-keyed order looks like admin. The hour spent hunting for a reagent looks like being busy. The frantic recovery from something that has gone wrong.

You need a lens that makes it visible. Lean is that lens.

What lean is

Between the late 1940s and the 1970s, Toyota built a disciplined way to find and remove waste from manufacturing. Western manufacturers later adopted it as “lean thinking”, and it transformed their productivity, quality and cost.

At its heart is one question: does this step add value? In a lab, the value is the science. Every step either moves an experiment forward or it doesn’t. Lean calls the steps that don’t “waste”.

When I first learned lean properly, it was like a light bulb going on. I finally had language for things I’d been watching for years but couldn’t put into words.

Why factories fixed it and labs didn’t

Manufacturing applied lean rigorously. Most other fields never did. I think there are two reasons.

First, on a factory floor, waste is visible. You can see stock piling up, people waiting, faulty products coming off the line. In a lab, the waste hides in email threads, in spreadsheets and in people’s heads. It’s Invisible Drag.

Second, manufacturers had no choice. In the 1970s and 1980s, Japanese competition was an existential threat. Lean was about survival. Labs have never faced that kind of pressure. Until now.

The rowing boat

When I was first taught lean, my instructor showed one image that has stayed with me for decades.

Picture a person in a small rowing boat. Beneath the surface, the seabed is covered in rocks. The water between the boat and the rocks is your buffer: spare stock, spare capacity, workarounds. While the water is deep, you row along happily, unaware of what’s underneath.

Now imagine a lab runs out of a critical reagent. An experiment is delayed and someone gets difficult questions. So, to make sure it never happens again, they double the stock. Problem solved.

Except it isn’t. Doubling the stock brings costs nobody measures: cash tied up on shelves, expired reagents written off, more storage, more handling, more counting. And the rocks are still there. Nobody asked why the lab ran out. An unreliable supplier? No visibility of what was already in the freezer? A broken reorder process?

Then one day the water level drops. A budget cut, or a new manager asking why so much cash sits in stock. The boat hits the rocks: emergency orders, frantic recovery, finger-pointing. And the response? Add more water.

High water

Buffers: spare stock, spare capacity, workarounds
Problems stay hidden.

Low water

Unreliablesupplier No stockvisibility Broken reorderprocess
Lower the water on purpose. Find the rocks. Remove them.

That’s the cycle lean breaks.

Buffers feel safe, but they hide problems.

The discipline is to lower the water on purpose, expose the rocks, and remove them one by one.

The eight wastes, in a lab

Initially seven types of waste were identified. Lean practitioners later added an eighth, non-utilized talent, and in a lab I’d put it first. Here’s what each looks like in lab purchasing, inventory and equipment.

  1. Non-utilized talent

    People doing work below their skill level

    A PhD scientist spending the afternoon chasing a supplier for a quote

  2. Waiting

    Work stalled because something upstream hasn’t arrived

    Experiments paused for an approval, a delivery or a broken instrument

  3. Defects

    Errors that need rework

    Wrong item ordered from inconsistent catalog data. An invoice that doesn’t match the PO

  4. Extra-processing

    More work than the outcome needs

    The same order typed into three systems. An approval step guarding against a risk that went away years ago

  5. Inventory

    Holding too much, or not having what you need

    Expired reagents written off. Emergency orders because nobody can see stock levels

  6. Motion

    People or information moving more than necessary

    Walking between labs to find a reagent. Switching between six tools to finish one task

  7. Overproduction

    Producing more, or sooner, than needed

    Ordering in bulk to avoid the pain of reordering, then throwing out what expires

  8. Transportation

    Moving things without adding value

    Data exported from one system, reformatted and imported into another. Goods logged in one place, moved to another

Most labs find every one of the eight within an hour of looking. The aim isn’t to list every waste. It’s to find the few that cost the most and start there.

Lean in real labs

This isn’t theory. Labs that have applied lean report results that most operations teams would struggle to believe.

A research cleanroom at MIT

In 2018, Professor Canan Dagdeviren’s team at the MIT Media Lab applied 5S, a lean method for organizing a workspace: sort, set in order, shine, standardize, sustain. Every item got a fixed home and a label. Procedures were written down and everyone was trained. They switched to just-in-time ordering. Over the following year, chemical spending fell 41%, materials spending fell 52%, and the number of devices the lab produced rose 116%. When COVID-19 forced labs to close in 2020, theirs shut down safely in 15 minutes.

A pharma quality control lab

In a 2018 article, consultants at Tunnell Consulting describe a pharma company’s QC lab that redesigned how it scheduled and ran its testing using lean principles. They report that testing turnaround fell by more than half and analyst productivity rose by more than 25%. Right-first-time rose from 95% to above 99%, with no increase in equipment or staff costs.

A second pharma QC lab

Using Lean Six Sigma, the QC lab of a global pharma company cut its average testing cycle time from about 15 days to 8, mainly by running tests to a fixed weekly rhythm. Before, only two-thirds of samples met a 15-day target. Afterward, all of them met a tighter 10-day target, with 15 analysts instead of 20.

A hospital histology lab

Researchers reorganized workstations, moved equipment, smoothed the flow of work and brought in a new automated stainer. The number of manual steps fell by 17%, and the distance each specimen traveled roughly halved. The first slides were ready in 4 hours instead of 12.

  • MIT research cleanroom116%more devices made, with 41% less spent on chemicalsDagdeviren et al., 2020
  • Pharma QC lab50%+faster testing turnaroundTunnell Consulting, 2018
  • Global pharma QC lab15 → 8 daysaverage testing cycle timeiSixSigma, 2010
  • Hospital histology lab12 → 4 hoursto the first slidesHassell et al., 2010

Notice what these results have in common. None of them reported adding staff, and only one needed new equipment. They came from looking hard at how the work actually flowed, and removing what didn’t add value.

Where lean goes wrong in labs

Lean has a mixed reputation in science, and some of it is earned. I learned that the hard way.

My first job out of university was at a major pharma company. I was 21, and I was asked to fix a bottleneck in shipping custom-built chemicals: safety testing, transport rules, packaging specifications. I had common sense and some confidence. I’m sure I improved it a little. But I didn’t have the tools to transform it. I was making small adjustments to a system I didn’t fully understand.

Since then, I’ve seen lean go wrong in three ways.

Jumping to solutions

I call it solutioneering. A team spots a bottleneck, someone suggests software to speed it up, and everyone agrees. The tool goes in and the bottleneck improves by 20%. Success? If they’d stopped to understand, they might have found the bottleneck only existed because of an approval step guarding against a risk that went away three years ago. Remove the step and the bottleneck disappears. No software needed.

Solutioneering: jumping to a solution before you understand the problem.

Jump to a solutionRequestApprovalSoftware20% faster
Understand firstRequestRemoved: ApprovalBottleneck gone

Understand first. The fix may not need software at all.

Cutting what you don’t understand

Not every process is waste. Some of it is hard-won wisdom: the control that protects a regulated material, the check that catches a real error. Throw those out and “transformation” destroys value.

Doing it to people, not with them

Asking someone how their process works is asking them to admit it could be better. For many people, especially senior ones, that feels like a judgement on their performance. If they don’t feel safe, they won’t tell you where the drag really is.

Lean is a toolkit. PURE is the method.

This is why I don’t start with lean. Over 30 years, I’ve layered lean, Six Sigma, 5S, root cause analysis, project management and change management on top of each other. What I eventually realized is that they all ask the same questions, in the same order. PURE is what you get when you bring them together into one method.

As a scientist, this made sense to me straight away. Every experiment starts with a hypothesis. You don’t just mix chemicals and see what happens. You define what you’re trying to achieve, understand the variables, design the experiment, then run it. PURE follows the same logic.

  • Purpose. Define the end-to-end purpose and get the scope right. Start here, never with solutions.
  • Understand. Map every stakeholder. Analyze every step. Find out what’s actually happening, not what people think is happening. This is where the eight wastes do their work.
  • Reimagine. Define the vision and design from scratch. Transform, don’t just improve.
  • Engineer. Generate options, evaluate them rigorously, then build, test and embed.
The PURE method shown as four test tubes labeled Purpose, Understand, Reimagine and Engineer, with a magnifying glass over Understand labeled Lean lives here.

The golden ruleIf I could give you one rule, it would be this: never start with solutions.

When someone asks “how do we make purchase orders faster?”, stop. The real purpose might be “get the right materials to the right people at the right time, at an acceptable cost, with the right controls.” That opens up very different answers, and many have nothing to do with purchase orders.

The labs in the examples above didn’t just tidy up. They knew what they were trying to achieve, looked hard at reality, redesigned the flow and made it stick.

Try it this week

Pick one process that frustrates your team. Ordering a common reagent is a good place to start. Follow one real order from request to the item on the bench, step by step. Don’t use the SOP: watch what actually happens. Then ask six questions of each step:

  1. What is this step for? If nobody can answer clearly, it’s a candidate to remove.
  2. How is it really done today? Not the policy. The reality.
  3. Who is involved, and what do they need?
  4. What works well? Keep it. Not everything is waste.
  5. What goes wrong? Let people vent. The detail matters.
  6. Which of the eight wastes can you see?

Then ask “so what?” A list of problems isn’t an answer. Look for the patterns, and the root cause underneath them. And remember the rowing boat: when you find a buffer, ask what rock it’s hiding.

Coming next

In my next post, I’ll tackle the question every lab is asking right now: can’t AI just fix this? The short answer is that AI multiplies whatever it’s given. Automate the drag, and you get the same drag, faster.

Want the full method now? My ebook sets out PURE step by step, with the tools to apply it in your own lab. Request your free copy.

Frequently asked questions

What is lean in a laboratory?

Lean is a disciplined way to find and remove waste, built by Toyota between the late 1940s and the 1970s. At its heart is one question: does this step add value? In a lab, the value is the science, so every step either moves an experiment forward or it’s waste.

What are the eight wastes of lean?

The eight wastes are non-utilized talent, waiting, defects, extra-processing, inventory, motion, overproduction and transportation. Seven were identified originally, and lean practitioners later added non-utilized talent. In a lab, that one matters most: a PhD scientist chasing a supplier for a quote is a classic example.

Does lean work in research labs, or only in manufacturing?

Lean works in labs. A research cleanroom at MIT cut chemical spending by 41% and more than doubled the devices it produced. A pharma QC lab cut testing turnaround by more than half, and a hospital histology lab had its first slides ready in 4 hours instead of 12.

How is lean different from PURE?

Lean is a toolkit. PURE is the method. PURE stands for Purpose, Understand, Reimagine and Engineer, and brings lean, Six Sigma, 5S, root cause analysis, project management and change management together into one method. The eight wastes do their work in the Understand step.

How do I start applying lean in my lab?

Pick one process that frustrates your team, such as ordering a common reagent. Follow one real order from request to the item on the bench and ask six questions of each step:

  • What is this step for?
  • How is it really done today?
  • Who is involved, and what do they need?
  • What works well?
  • What goes wrong?
  • Which of the eight wastes can you see?

Then look for the patterns, and the root cause underneath them.

Caroline Briggs is a scientist and the founder and CEO of MyAmici. She has spent 30 years in pharma and biotech. MyAmici is the lab operations backbone for more than 250 life sciences companies, covering purchasing, inventory and equipment.